| FPS Vertical Firetube Steam Boiler - Specifications |
|
Model FPS Fire Tube Steam Boiler Note: items shown in parenthesis () are options. 1. General Furnish and install as shown on the plans ____ one (1) Precision model FPS____-_____ forced draft, gas fired vertical firetube boiler rated at _____ boiler horsepower. Boiler shall be designed for a maximum allowable working pressure of (15psi) (150psi) and shall deliver _____lb/hr (F&A 212º F) of steam at ____ psi (up to 135 psi) operating pressure. Boiler shall be completely factory assembled and tested, with controls and trim as specified below. Complete package shall be UL Listed and shall carry the Underwriters Laboratories Listing Mark. Units rated at 9.5 boiler horsepower and over shall also comply with ASME CSD-1. Boiler shall be designated for _____V, _______PH, _______HZ electrical supply with single power connection. 2. Pressure Vessel Vessel shall be constructed and stamped in accordance with ASME Section IV (15 psi) or Section I (150 psi) and shall be registered with the National Board. Shell and tubesheets shall be fabricated from carbon steel. Tubes shall be 2” OD x 0.105 wall SA178A ERW tubing. Vessel shall be stress relieved (units > 15psi design) and equipped with inspection openings as required by ASME Code. 3. Combustion Chamber Combustion chamber shall be fabricated from steel plate, lined with ceramic fiber blanket. Combustion chamber wall and bottom shall be of monolithic construction, formed from high temperature refractory, not less than 4” thick. 4. Burner Provide forced-draft, flame retention head burner to burn natural (LP) gas with on-off (low-high-low or full modulation) firing rate control. Burner shall be equipped to fire at a maximum input of _____Btu/hr at an elevation of _____ ft. Blower motor shall be 3450 rpm design with motor starter (units over ¾ hp). Burner controls shall conform to UL795 (and CSD-1, FM, IRI codes). For electrical supplies other than 120V, the burner shall be equipped with a control circuit transformer. 5. Boiler Controls Boiler shall be provided with the following controls:
6. Packaging Complete package shall be factory assembled and mounted on structural channel support skid. All specified components are to be mounted, piped and wired. Boiler shall be insulated with a minimum of 4 inches of ¾ pound density fiberglass and housed in a rectangular, 16 gauge enamel painted steel jacket. Jacket temperatures shall not exceed 130º F during continued operation at high fire. Lifting lugs shall be provided to allow rigging of package during installation. 7. Quality Control Complete packaged boiler shall be manufactured by Precision Boilers in strict accordance with ASME Boiler and Pressure Vessel Code in an ISO 9002 quality system. Specifications subject to change without notice. |

